UCF 2nd Floor Library Renovation Project Featured on UCF TV Thu, Dec 8, 2011
Construction began in May 2010 and continued all summer. The new learning environment opened on August 23rd 2010, just in time for the fall semester. Partially funded by the 2009/2010 Student Technology Fee, this space is designed to meet the needs expressed by UCF students and faculty.
B+P was responsible for the design and the interiors. The finished space has been met with overwhelmingly positive feedback. Go Knights!
Categories: Blog