Longwood Elementary School Renovation

Details

Client: School Board of Seminole County

Location: Longwood, FL

Cost: $6,000,000

Size: 66,317 SF

Summary

As part of a Design/Build team, Borrelli + Partners, Inc. was selected to renovate and refurbish the existing Longwood Elementary School campus. Due to the country’s economic downturn, the school closed its doors in 2011. B+P is proud to have modernized the 58-year-old campus.

The scope of work included site investigation for facility assessment and creating a final scope verification report. The scope also included renovating: science, math, technology and engineering labs; a media center; cafeteria; and the roof and air conditioning system. These upgrades make the school and students “future ready,” said Principal Brian Emmans.